SEARCH
The Following Works Should Be Done Before Starting Industrial Chillers
2. For the compressor unit with water system, carefully check whether the cooling water system and chilled water system have water, and whether the water pressure is normal, whether the pipeline system of cooling water and chilled water is unblocked.
7. Check whether there is leakage in refrigerant system of industrial chiller and whether there is leakage in lubricating oil system.
Related recommendations
-
Attention points for daily inspection of low temperature control equipment at minus 30℃
119The low temperature control equipment at minus 30 degrees Celsius is a refrigeration unit or also called a refrigeration unit. The difference from the chiller is the temperature range. It i...
View Details -
What should we pay attention to when storing the refrigerant of the chiller? What are the acceptance
110Refrigerant is an essential substance to make the chiller have refrigeration effect, which has great potential safety hazards in the use process. Refrigerant, also called refrigeran...
View Details -
New energy vehicle direct cooling direct heating unit
59New energy vehicle direct cooling direct heating unit In the application of new energy battery motors, a certain amount of heat will be generated, so the direct cooling and direct heating...
View Details -
Explosion-proof ultra-low temperature refrigerator internal leakage instructions
1181. Sound leak detection method: First, the refrigeration pipeline of the explosion-proof ultra-low temperature refrigerator is filled with nitrogen. Then use a stethoscope to check the int...
View Details
HelloPlease log in