The Following Works Should Be Done Before Starting Industrial Chillers
2. For the compressor unit with water system, carefully check whether the cooling water system and chilled water system have water, and whether the water pressure is normal, whether the pipeline system of cooling water and chilled water is unblocked.
7. Check whether there is leakage in refrigerant system of industrial chiller and whether there is leakage in lubricating oil system.
Related recommendations
-
Comparison of Three Test Methods for Low Temperature Chamber
12342. Non-heat dissipation test samples and heat dissipation test samples When the temperature of the test sample is stable during the conditional test period, the hottest spot temperature on the surface of the test sample is higher than the ambient ...
View details -
TCU temperature control model selection and technical parameter description
1360TCU temperature control is also a two-cycle unit single-fluid temperature control system. When selecting the model, it is very important for the whole temperature control reaction. Only the appropriate reaction system is used to exotherm and absor...
View details -
LED LCD display thermal test system operation process
992The integrated semiconductor industry has developed rapidly in the past two years, which has driven other industries around it. The chip thermal test system is one of the products. In order to avoid machine failures in the LED liquid crystal displ...
View details -
How to solve the phenomenon of ultra-low temperature freezer card cylinder?
1487If the ultra-low temperature freezer room fails during operation, it needs to be solved in time. If it is similar to the related phenomenon, it may be that the frozen oil does not come up, and the operator needs to solve it in time. Ultra-low temp...
View details