News

Linear rapid temperature change tester emptying and filling instructions
Before starting the linear rapid temperature change tester, check whether the relevant protective measures are in place, such as fire protection, protection, leak prevention and other tools. Check whether the power supply is in place according to the power supply installation and equipment grounding, whether the phase sequence is correct, and whether the grounding is good. Then power on the equipment, and then check whether the relevant valve is open. Otherwise, the circulating pump will be b...
View details
Start-up work for new energy thermal management
In the pipeline selection of new energy thermal management, if the use of improper/damaged hoses and/or hose joints will result in injury, the new energy thermal management is limited by the temperature, caliber, installation method, etc. Tube, metal insulation hose temperature range -60 ~ 250 ° C; pressure ≤ 2.5 bar. When the new energy thermal management configures the metal insulation hose and other pipelines carefully, when referring to its pressure and overpressure capability, caliber an...
View details
Fully closed cycle high viscosity fluid refrigeration heating flow control system
Application:1. The tested object is connected to a test platform adapter.2. The internal parts of the parts are cooled, heated, flow controlled, and pressure controlled by various lubricating oils, hydraulic oils, aviation fuel, fuel oil, and coolant.3. The test component needs to go through a specific temperature profile and record the change in temperature.4. When conducting the tolerance test, perform the thermal shock test, and the rapid temperature drop control usually takes place in...
View details
Small environmental test chamber compressor should pay attention after maintenance
In the centrifugal small-scale environmental test chamber, the suction recovery device is generally an independent system, and if necessary, the pipeline connected to the condenser and the evaporator can be closed for separate maintenance. After replacing the compressor in the small environmental test chamber, the pumping recovery device generally uses the automatic mode to open, stop and work during the operation of the unit. Therefore, the oil level of the oil separator of the piston compre...
View details
High temperature test equipment related troubleshooting
The high temperature test equipment is mostly caused by water shortage in the water circulation. This way, the purified water is replenished to the water tank until the water level meter on the lower right side of the water tank reaches about 80% of the entire scale. Every equipment will be fully commissioned before shipment. During the commissioning process, we have done ample tutorials for each internal system. If the equipment is in transit, due to up and down vibration, the float and the ...
View details
Cryogenic storage tank (explosion proof) chemical cryogenic storage
Product Overview:Microcomputer control, multiple security protection, and more reliable operation; Single-compressor automatic cascade supercooling refrigeration technology; compressors use Secop and France Taikang brandContactors and circuit breakers are all based on the Schneider brand; Display high and low pressure of refrigeration system; user-friendly design, flexible and convenient; With self-diagnosis function, freezer overload protection, high-pressure pressure switch, overload rela...
View details
Ultra-high temperature material cold and hot impact box refrigeration oil
The ultra-high temperature material impact test chamber test device has too much frozen oil in the evaporator, which can also cause insufficient cooling and cause slow cooling. The oil stored in the evaporator of the ultra-high temperature material impact test chamber test device can be directly judged by the hot and cold boundary line of the oil surface. If the oil level is too high, it should be released in time. Some Freon and refrigerating machine oil dissolve each other. Therefore, when ...
View details
Selection of electrical components for rapid temperature change test chamber
How to install and debug the electrical of the rapid temperature change test chamber? Need to refer to the following methods for power distribution, pay attention to the capacity of the power supply, do not use a single power supply for multiple equipment, so as to avoid voltage instability, affect the performance of the rapid temperature change test chamber machine, and even cause rapid temperature change test chamber failure shutdown. According to the incoming power supply wiring of the rap...
View details
Cooling heating temperature control system SUNDI series thermal fluid filling instructions
1. Refrigeration heating temperature control system SUNDI series equipment before the heat conduction filling, the heat transfer liquid inlet of the heating refrigeration circulator and the heat transfer liquid outlet of the upper end of the reaction kettle are connected by stainless steel bellows, and the heat transfer oil outlet of the heating and cooling circulator and the lower end of the reaction kettle are connected. The heat transfer oil inlet is connected by a stainless steel bellows....
View details
Common fuel cell environmental test device inspection method
During the cooling process of the fuel cell environmental test device, there is a chance of dripping inside. This is not a normal phenomenon used by the fuel cell environmental test device, but is caused by improper installation. After the fuel cell environmental test device is installed, test the machine (refrigeration) immediately. If there is no water leakage after running for a certain period of time, there will be no leakage problem. Of course, the installer can also be required to carry...
View details
LNEYA Industrial Chillers Manufacturer Supplier










