High temperature silicone oil cooling and heating cycle machine maintenance steps
The mechanical wear of the high temperature silicone oil cooling and heating cycle machine is an important factor that directly affects the refrigeration capacity. It is necessary to record the operating parameters during use, often listen to the sound during the operation, and check the refrigerant and refrigerating oil. Troubleshoot based on this, regular maintenance and maintenance, so that when the high-temperature silicone oil cooling and heating cycle machine fails, the maintenance personnel can quickly find the problem and eliminate the fault by referring to the recorded parameters.
Maintenance steps:
1. Discharge the refrigerant in the industrial chilled system: the needle valve is kept on the suction side of the industrial explosion-proof low-temperature refrigerator, the three-way valve is connected to the needle valve, the operating valve is opened, and the inside of the refrigerator is cooled. All reagents in the industrial refrigerator system have been discharged;
2. Replace the faulty parts of the high-temperature silicone oil cooling and heating cycle machine: If you know which parts are faulty, please directly replace the faulty parts;
3. Nitrogen flushing and pressure test: Nitrogen is still injected through the needle valve on the suction side of the industrial high-temperature silicon oil cooling and heating cycle machine;
4. Vacuum: After the pressure test, the industrial refrigerator needs to be vacuum cleaned to ensure that there is no problem;
5. Refrigerant filling: There are two filling methods for the refrigerant in the high-temperature cooling and heating cycle machine, namely the low-pressure side filling method and the high-pressure side filling method;
6. Test run: After completing the above steps, please test run the high-temperature silicone oil cooling and heating cycle machine to ensure that there is no problem;
After completing the maintenance of the high-temperature silicone oil cooling and heating cycle machine and troubleshooting, the performance of the corresponding parts will be tested to ensure the reliable and stable operation of the equipment.
Related recommendations
-
Operation method of reaction kettle for circulating heating device
1670The laboratory single-layer glass reactor equipped with the circulating heating device can place a flask containing the reaction solvent on the inner layer for stirring reaction, and the interlayer can realize constant temperature heating and cons...
View details -
Usage Details of High and Low Temperature Environmental Chambers
1677The enterprise users must have a certain understanding of the functions of the high and low-temperature environmental chamber after using them for a long time, but something detail of the high and low-temperature environmental chamber may still no...
View details -
Temperature control of integrated circuit/chip wafer quality and reliability test items
1925The most basic part of making a chip is design-tape-package-test. The chip cost structure is generally 20% of labor cost, 40% of tape, 35% of package, and 5% of test. The test is actually the most in all aspects of the chip. "Cheap" step, but the...
View details -
Detailed Electric Vehicle Motor Test And Test System
1540New energy vehicles need to have power system, drive system, control system integration test capability, and electronic electronic control test system function test capability. For component manufacturers, this test development capability is also ...
View details
LNEYA Industrial Chillers Manufacturer Supplier










