The Following Works Should Be Done Before Starting Industrial Chillers
2. For the compressor unit with water system, carefully check whether the cooling water system and chilled water system have water, and whether the water pressure is normal, whether the pipeline system of cooling water and chilled water is unblocked.
7. Check whether there is leakage in refrigerant system of industrial chiller and whether there is leakage in lubricating oil system.
Related recommendations
-
Where will the reactor be used? How about the reactor temperature control system?
916Generally, non professionals should be confused about the reactor. The reactor is composed of reactor body, reactor cover, jacket, agitator, transmission device, shaft seal device, support, etc. It is generally understood as a container with physi...
View details -
Design and Test Technology of High Temperature Environmental Chamber Sales
13231. Temperature selection (1) The climatic zones of the region; Whether the product is exposed to the solar radiation environment near the heating device; Surrounding air, solar radiation and ways of heat transfer from heating devices to products;...
View details -
Thermal oil heating system installation and fault analysis
1350When the heat transfer oil heating system device is installed, it is necessary to pay attention to the system to avoid some faults during installation. If a fault occurs, it is necessary to understand the faults related to the heat transfer oil he...
View details -
Instructions for cold assembly of bearings in ultra-low temperature industrial refrigerators
1023The refrigeration system of ultra-low temperature industrial refrigerators generally adopts the working principle of cascade refrigeration, and two fully enclosed compressors are used as high and low temperature compressors. The copper tube of the...
View details