Maintenance and maintenance of battery pack test temperature simulation chiller

The battery pack test temperature simulation chiller is more and more widely used in enterprises, but the subsequent maintenance and maintenance are also more important. Here is a brief introduction to some maintenance and maintenance methods.
1. The temperature of the battery pack that does not need to be opened is not closed before the start-up to simulate the water inlet valve of the condenser on the chiller, resulting in water leakage. Part of the cooling return water flows away from the condenser of the non-starting unit, reducing the cooling water flow in the condenser of the operating unit, causing the condensation pressure to rise, the operating current of the main engine to increase, and the cooling capacity of the unit to decrease. Stopping the operation not only wastes electricity, but also reduces the cooling effect, and is easy to damage the equipment.
2. Before starting up, close the water inlet valve of the condenser of the unit that does not need to be operated to prevent water leakage. Open the water inlet and outlet valves on the condenser of the unit to be operated (generally the outlet valve is normally open, the water inlet valve is opened and closed according to needs. The condenser and the evaporator are the same) and turn on the corresponding cooling water pump to adjust the water inlet and outlet pressure of the condenser.
3. If the pointer of the pressure gauge of the water inlet and outlet of the condenser swings too much, it means that there is air in the equipment system, and the air needs to be exhausted to continue to the next step after the pressure gauge indicates normal.
4. It adopts an intelligent main control board, and the LED display is stable and durable, with multiple settings and fault display functions; it is equipped with a water outlet pressure gauge, which is convenient for observing pressure and flow.
Related recommendations
-
Detailed explanation of closed circulation cooling system debugging attention
1213The preparation of the closed circulation cooling system before commissioning is an important part of the debugging process, which may affect the progress of the whole debugging process. Generally, attention should be paid to the leakage detection...
View details -
What is the temperature control of the reactor?
1215The reactor cooling system is one of the common equipment in the chemical industry. It can not only heat but also refrigerate to meet the needs of heating and cooling in the reaction process. There are usually three ways to control the temperatu...
View details -
Commissioning of circulating water chiller equipment in the chemical industry
1071After completing the installation of circulating water chillers in the chemical industry, certain debugging needs to be carried out in the early stage of operation. Only through careful debugging can we find out whether there are hidden troubles i...
View details -
Protection device details of circulating fluid temperature control device
1200The circulating pump overload protection function is to cut off the main power of the circulating pump when the circulating liquid temperature adjustment device is too large. Press the green button when resetting; the red button is the stop button...
View details