The Installation Requirement of the Industrial Chiller
1. Power supply
(1) The chiller power supply adopts three-phase four-wire, power supply line (R, S, T) connected with power supply fire line, (N) zero line, (G) ground line.
2. In order to ensure the safety and normal operation of the air conditioning system and prevent the failure of chillers caused by inappropriate water distribution pipeline construction, the following matters should be paid attention to when installing this unit:
Related recommendations
-
-
SUNDI Cooling And Heating System-R & D testing of organic synthetic materials and fine chemicals
1279LNEYA's customer is a research institute engaged in the research, development and production of high-performance, environmentally-friendly new organic materials and fine chemicals.The adhesives produced by customers can be used in integrated circu...
View details -
Distillation tower process chiller heating system
1146Distillation towers and distillation tower processes indeed require chillers and heating systems to maintain temperature control during the process, ensuring effective separation and purification operations. The top temperature of the ...
View details -
Several Common Troubleshooting Methods for Ultra-low Temperature Freezer in Laboratories
11301. After power supply is switched on, the air switch of the main power supply is automatically disconnected.Elimination method: Check whether the compressor of refrigeration system is damaged or not, and replace the parts if damaged. After replaci...
View details