Parameters of small gas condensing liquefaction system
During the process of loading and unloading gasoline and refueling vehicles, and collecting high-concentration gas from the chemical plant. One or two methods in the process of adsorption or condensation, or the conversion of oil and gas from a gaseous state to a liquid state, and then into gasoline, to achieve recycling purposes. Oil and gas recovery is a high-tech energy-saving and environmentally-friendly technology. By improving the utilization rate of energy and reducing economic losses, it can obtain considerable benefits.

Wuxi Guanya LNEYA small gas condensing liquefaction system is used to cool the gas (non-corrosive) or condensate and recover as a non-corrosive gas.
The gas heat exchange system has a pressure resistance of 25 bar; the temperature range is from -40 ° C to -75 ° C, which can meet different temperatures; the internal use of environmentally friendly refrigerants; the use of secondary subcooling technology, rapid cooling, low temperature limit.
Imported brand semi-closed piston compressor, scroll flexible compressor, fully enclosed piston compressor, the main brands are Duling, Taikang, Emerson; the evaporator uses a casing heat exchanger, small size, long residence time, high efficiency ;
Use a full set of imported cold controls (DANFOSS pressure controller, balance valve, expansion valve, solenoid valve, dry filter, Emerson oil separator, ALCO sight glass, check valve, etc.);
The use of Danfoss expansion valve, Emerson electronic expansion valve, high temperature control accuracy;
It adopts Siemens PLCS7-200/300PLC and LNEYA touch screen display to carry out automatic control operation, and has temperature curve display, temperature record U disk, fault alarm record;
The whole machine is installed, the system has been tested in the factory, and the user only needs to install the refrigerant pipeline and the cooling water pipeline to complete the operation;
Factory test: Each refrigeration unit is tested at the factory with a load of not less than 12 hours.
Related recommendations
-
The Installation Requirement of the Industrial Chiller
1004(1) The chiller power supply adopts three-phase four-wire, power supply line (R, S, T) connected with power supply fire line, (N) zero line, (G) ground line.,
View details -
How to solve the frosting of the low temperature circulation device?
1354The failure of the low temperature circulation device frosting is mainly because the compressor return air temperature is too low, which may be that the throttle valve liquid refrigerant supply is in a normal state in the low temperature circulati...
View details -
About the size and installation height of refrigeration heating temperature control system equipment
882Whether it is biopharmaceutical, traditional Chinese medicine or chemical pharmacy, pharmaceutical companies are all related to chemistry, because the extraction and synthesis of pharmaceutical ingredients are all in the form of chemical products...
View details -
Motor test bench test and temperature system for vehicle components
1379All vehicle components must undergo rigorous testing, but safety programs must undergo more stringent durability and terminal testing. Many physical methods can be used to load the motor, but the small motor test bench is favored for its high spee...
View details