How to Solve the Problem of Water Supply in Low Temperature chiller system
Due to the improper operation of low temperature chiller system, there is the possibility of water entering into refrigerant system. Therefore, in view of the problem of water supply in low temperature chiller system, process guidance is formulated to serve as a reference for maintenance.
1. Analyse the reasons. Check the whole low temperature chiller system to confirm the cause of freezing damage and find out the leak point.
2. Blow dirt in sections.
(1) First, air compressor can be used to blow water (save nitrogen), until no water mist precipitate. Then blow with high pressure nitrogen, at the same time, heat the nitrogen (the nitrogen cylinder is prohibited from heating).
(2) Because the pipeline of low temperature chiller system is complex, water can be blown out in segments by using welding torch in some parts according to specific conditions.
(3) Heat and dry. The capillary, thermal expansion valve, compressor and other small components can be placed in the oven to bake and dry. Do replace the refrigerating oil in the compressor after the water is dried.
1. Vacuum drying
(1) Restore the pipeline and maintain the nitrogen pressure to ensure the air tightness of the system. Then connect the vacuum pump to the system for vacuum drying. (Dry filter barrel should be added to the front end of vacuum pump to avoid excessive water and gas entering the vacuum pump)
(2) In the process of vacuum drying, heat the place where water is easily stored in the pipeline, and the time can be determined according to the site.
2. Debugging and running.
(1) Make sure that the water in the system is basically removed.
(2) Connect the external drying filter barrel to the system and replace the desiccant after running for 5 minutes. At the same time, observe the operating parameters of the unit and pay attention to the sound of the compressor. If the dry filter is cold, the expansion valve frosts, and there is a pressure difference of more than 0.5 kg before and after the return air filter, stop the compressor immediately.
3. Completion of maintenance
(1) Remove the refrigerant pipe from the drying filter barrel and restore it.
(2) Check the supplementary refrigerant quantity. Turn on and check the machine running parameters to confirm normal.
Related recommendations
-
Rapid temperature change test chamber temperature control instructions
1118The selection of the humidity range of the rapid temperature change test chamber should be noted that the corresponding temperature range should be indicated after the humidity index or the dew point temperature should be given. Because relative h...
View details -
Chip high and low temperature aging test box system design
1076The high and low temperature aging test box of the chip is applied to the high and low temperature test industry of the chip. The design schemes provided by the high and low temperature aging test box manufacturers of different chips are different...
View details -
LNEYA cooling and heating thermostat bath instructions
1398Circulating thermostatic water bath is water circulation and cooling function based on the increase in the water bath, can improve the precision of temperature control and temperature stability, can be widely used for drying, distillation, concent...
View details -
What Is the Range of Industrial Chiller Temperature Control
1600Industrial chiller is a common refrigeration equipment in industrial refrigeration industry,whose feature is various types, complete models and wide range of applications.More importantly, the precision of chiller temperature control is high and t...
View details