Wuxi Guanya Refrigeration Technology co., ltd
products
Contact
Tel: + 86 510 82303782
E-mail: sales@cnzlj.com
Add: No.203, Hongyun Road, Hongshan Street, Optoelectronics Park, Xinwu District, Wuxi City, Jiangsu Province,China
code chat

How to deal with the malfunction of Industrial Water Chiller System?

What's wrong with the Industrial Water Chiller System when it fails to cool down?

Let LNEYA explain it to you below:

One reason is that the initial use of liquid chiller system fails to reduce the temperature, or there is something wrong with the installation of water-cooled chiller, cooling water tower, circulating water pump and pipe. It needs to be carefully checked according to the installation diagram.

The second reason may due to the pipes which are attached to various devices for a long time, and the impurities have accumulated in the water sources, resulting in smaller water flow. Therefore, we must clean the pipes between the devices.

Thirdly, If this problem occurs during the first use, it may cause by the wrong matching of the chiller and the problem of delivery. Because the industrial chiller has carried out 100% performance tests before getting out of the machine to ensure the normal operation of the machine unit.

Finally, If this is the case of a chiller that has been used for half a year or 1-2 years later, it may due to the leakage of Freon in the cooling system of the cold water machine. It is suggested to find out the leakage, weld it again and refrigerant. The heat exchanger of the water-cooled chiller is dirty and needs washing, and remember to clean it regularly after subsequent use.

The operation of any Industrial Water Chiller System is inseparable from the participation of refrigerant. So the shortage of refrigerant will affect the normal operation of the industrial chiller, and then result in the reduction of refrigerating capacity of the industrial chiller and even shut down, which is also the main reason for the shrinkage of the refrigerating capacity of the industrial chiller.

Related News
Related Products
  • Ultra-Low Temperature Cooled Chiller -150℃

    Ultra-Low Temperature Cooled Chiller -150℃

    January 11, 2018Temperature ranges from - 5 ~ - 150 degrees, can meet different temperature; Adopt environmental protection refrigerants; Famous brand semi-closed piston compressor, semi-closed bipolar piston compressor, semi-hermetic screw compressor, main brand are BOCK.view
  • High-Low Temperature Test Chamber

    High-Low Temperature Test Chamber

    March 30, 2018Performance characteristics:1. In the refrigeration system, the condensation adopts air cooling mode, which has a wide temperature control range, which can meet the user's various needs.2. With a unique b...view
  • Humidity Test Chamber

    Humidity Test Chamber

    April 8, 2018Performance characteristics: 1. With wide temperature control range, can meet the user's various needs.2. With a unique balanced temperature control method, with stable and balanced heating capacity, high precision and high stable temperature control canview
  • Single fluid heat transfer temperature control system SR TCU

    Single fluid heat transfer temperature control system SR TCU

    April 10, 2018Working temperature range from -25℃to 200℃, other temperature range need to set to the widest temperature range(-50℃to 250℃) Centralized control of 2~20 reactors, each reactor's and jacket temperature can be set independently. One system control multipleview
  • Reactor material temperature control system ZLF TCU

    Reactor material temperature control system ZLF TCU

    April 10, 2018A set of cooling heat exchanger, heat exchanger, through proportional adjusting valve control cold heat into the heat exchanger, then through the uniform medium input to the reactor jacketed to do heat exchange and temp. Control, system has inside expansiview
  • Small Gas Condensing System

    Small Gas Condensing System

    April 10, 2018ModelHQ-0540HQ-1040HQ-2540HQ-5040HQ-0575WHQ-1075WHQ-2575WHQ-5075WGas flow5m3/h10m3/h25m3/h50m3/h5m3/h10m3/h25m3/h50m3/hLowest Temp.-40℃-40℃-40℃-40℃-75℃-75℃-75℃-75℃Primary Temp.There is no-20℃...view
  • TEL:+ 86 510 82303782
  • FAX:+ 86 510 88587187
  • EMAIL:sales@cnzlj.com
  • ADDRESS:No.203, Hongyun Road, Hongshan Street, Optoelectronics Park, Xinwu District, Wuxi City, Jiangsu Province,China