Selection of electrical components for rapid temperature change test chamber
How to install and debug the electrical of the rapid temperature change test chamber? Need to refer to the following methods for power distribution, pay attention to the capacity of the power supply, do not use a single power supply for multiple equipment, so as to avoid voltage instability, affect the performance of the rapid temperature change test chamber machine, and even cause rapid temperature change test chamber failure shutdown.
According to the incoming power supply wiring of the rapid temperature change test chamber, the domestic voltage is divided into 220V50HZ and 380V50HZ. The rapid temperature change test chamber should be equipped with a suitable power cord, which should not be too thin to avoid loops. For example, the power supply and voltage of the rapid temperature change test chamber of Wuxi Guanya Constant Temperature Refrigeration Technology Co., Ltd. have changed, and should not exceed 5% of the rated voltage. The stable voltage will be beneficial to the use of high and low temperature test chambers.

Do not open the test hole or install the power socket on the rapid temperature change test chamber. Because the rapid temperature change test box will be designed according to the size and requirements of the machine before the factory, the power and voltage should be designed. phenomenon. Pay attention to the wiring when installing the rapid temperature change test chamber, and the wiring may not be damaged.
At the same time, the components of the rapid temperature change test chamber are more important. It is recommended to choose the guaranteed fast temperature change test box components as much as possible.
Raccomandazioni correlate
-
What do you need to consider for a car battery cooling water cycle heat exchanger?
931The car battery cooling water circulation machine has always been one of the most popular equipments. The design of the heat exchanger piping also needs to be designed. What aspects should be considered? There are many types of heat exchange equip...
Visualizza i dettagli -
Qual è la ragione per cui il sistema di refrigerazione industriale non può essere raffreddato
1228Let the LNEYA technical engineer explainthe reason for everyone: The first one: The chiller system fails tolower the temperature during the first use, or there is a problem with theinstallation of the industrial water chiller, cooling tower, ...
Visualizza i dettagli -
Semiconductor refrigeration heating cycle air system test description
947There are many test items in the refrigeration and heating circulating air system for semiconductors. So, how much do users know about out-of-channel testing? The out-of-channel test of the cooling and heating circulating air system for semiconduc...
Visualizza i dettagli -
Is the choice of a centrifugal pump or a volumetric pump in a pharmaceutical laboratory?
1273Performance: In order to be able to select the type of pump that is suitable in the pharmaceutical laboratory, it is necessary to have a deep understanding of its performance and understand the difference in its specific working principle. To this...
Visualizza i dettagli