Descrizione del sistema di alimentazione+strumento di controllo elettronico della cella frigorifera a bassissima temperatura LNEYA
LNEYA ultra-low temperature cold box needs to be tested after a long time of use. What should be paid attention to when the power supply and electronic control instrument system are inspecting?
LNEYA ultra-low temperature cold box power supply and electronic control instrument system inspection, before power-on should check whether the distribution capacity and unit power are consistent, whether the selected cable diameter can withstand the host operating current. Check whether the electrical system is consistent with the unit. The unit is electrically: three-phase five-wire system (three phase lines, one neutral line, one ground line, 380V ± 10%). Check if the power supply line of the compressor is connected tightly. If it is loose, retighten it. The torque at the compressor wiring is 500kg/cm. Due to factors such as long-distance transportation and lifting, the screws may be loose. Failure to do so may result in damage to electrical components (such as air switches, AC contactors, etc.) and compressors in the main control cabinet.
Use a multimeter to carefully inspect all electrical circuits of the LNEYA ultra-low temperature cold box, check that the wiring is properly installed in place; use megaohm measurement to make sure there is no short circuit in the case; check that the ground wire is properly installed in place, and the insulation resistance to ground is greater than 2MΩ; check if the power cable is Meet the capacity requirements. Check if the disconnect switch is installed on the power supply line of the supply unit. All the wiring of the main circuit in the control cabinet and the external wiring of the control circuit can be energized after comprehensive inspection (such as crankcase oil heater, compressor electronic protector, circulating water temperature sensor, target flow switch wiring, pump connection) Control, etc.); Check if the terminal bolts are tightened and there is no looseness.
The performance of the power supply and the electronic control instrument are more important in the operation of the LNEYA ultra-low temperature cold box, so it is necessary to check the recommendations regularly.

Raccomandazioni correlate
-
How to choose low temperature and high temperature simulation equipment for material aging test?
1060Material aging testing is used in many industries, but how to choose high-quality low-temperature and high-temperature simulation equipment is very critical, because temperature plays an indispensable and important role in the testing process. LNE...
Visualizza i dettagli -
Discharge Operation Steps of Industrial Chiller in Ammonia Refrigeration System
1035The rubber hose used to connect the outlet valve joint causes one end to be inserted into the water of the water container. When the ammonia in the mixed gas is cooled into ammonia liquid, the bottom of the air separator will frost. At this time, ...
Visualizza i dettagli -
How to judge the operating status of the chemical and pharmaceutical constant temperature control sy
924Nowadays, many pharmaceutical and chemical industries use LNEYA's constant temperature control system. How to judge its operation status during operation? There should be no noise in the cylinder of the chemical and pharmaceutical thermostatic con...
Visualizza i dettagli -
13p semi-closed air-cooled compression condensing unit failure warning instructions
1183The 13p semi-closed air-cooled compression condensing unit is used in industrial cold processing. After using it for a long time, some problems will arise, Wuxi Guanya (LNEYA) reminds. There is usually a high-pressure alarm on the 13p semi-closed ...
Visualizza i dettagli